Everything your business needs to make an informed decision
Investing in commercial renewable energy is a major strategic step for any organisation. Below you will find clear answers to common questions covering commercial solar PV, battery storage, solar carports, project funding, and ongoing maintenance. If you need bespoke feasibility advice for your site, speak directly with our commercial engineering team.
Commercial Installation FAQs
Project Delivery & Accreditations
Do SolarSense provide a named project manager to supervise commercial installations?
Yes. Every commercial project is overseen by a dedicated SolarSense project manager who guides you from initial site survey through to commissioning and handover. They manage DNO grid applications (G99), structural assessments, health and safety documentation, and any planning permissions required.
Is SolarSense accredited for commercial health, safety, and quality?
Yes. SolarSense is an employee-owned Certified B Corp and holds MCS certification alongside ISO 9001 (Quality Management) and ISO 14001 (Environmental Management) accreditations. For commercial, industrial, and construction sites, we hold CHAS and SafeContractor approvals.
Are all SolarSense operatives qualified and do they carry CSCS cards?
Yes. All SolarSense site operatives hold valid CSCS or ECS cards alongside relevant electrical, commercial roofing, and working-at-height certifications as standard.
Can my business continue to operate during a solar or battery installation?
Yes. In almost all cases, commercial installations take place externally with minimal disruption to daily operations. For schools, academies, healthcare facilities, and busy industrial sites, we schedule deliveries, crane lifts, and brief electrical switchovers around term times or off-peak hours.
Should our business wait for renewable technology to improve before investing?
Over the 30+ years we have operated, laboratory breakthroughs have rarely translated into sudden overnight shifts on commercial rooftops. Modern Tier-1 solar PV and battery systems already deliver high efficiency and rapid financial returns. Delaying a project usually costs far more in lost electricity savings than any marginal hardware gain in future years.
Commercial Solar PV, Carports & Solar Parks
What is a typical payback period for a commercial solar PV system?
Commercial solar PV systems typically achieve full payback in 3 to 6 years, and high-demand sites can see payback in as little as 2 to 3 years. Exact returns depend on system size, daytime load profile, electricity tariffs, and whether you integrate battery storage. Contact us for a bespoke feasibility model for your site.
What solar panels do SolarSense install on commercial roofs?
As an independent contractor, SolarSense is not tied to any single manufacturer. We specify proven Tier-1 solar panels from leading global brands such as SunPower, REC, Jinko, and Canadian Solar, matching panel efficiency and warranty terms to your roof structure and budget.
Can you install solar panels on a commercial roof containing asbestos?
In some cases, yes, either through non-penetrative mounting systems or following professional encapsulation or over-cladding. Strict UK health and safety regulations apply, so our commercial survey team inspects the roof condition first and advises on safe, compliant options before design work begins.
Will roof orientation or shading affect commercial solar output?
South-facing roofs pitched between 30 and 40 degrees deliver the highest peak yield, though east-west configurations work exceptionally well for businesses with consistent morning-to-evening electricity demand. SolarSense completes a full 3D shading and yield analysis during your survey, using power optimisers where needed to minimise losses from plant equipment or partial shade.
What permissions are needed for a commercial solar carport, and what is the payback?
Many commercial solar carports qualify under Permitted Development rights in England (subject to height and boundary limits), though some sites require local authority planning permission alongside DNO grid approval. Because carports involve steel groundwork and structural canopies, capital payback is longer than a standard rooftop array. Larger carports spread civil costs across more panels, and integrating workplace EV charging and battery storage strengthens overall returns.
What is a solar park and how much land is required?
A solar park (or solar farm) is a ground-mounted photovoltaic array generating clean power at scale for on-site private wire supply or direct grid export. As a rule of thumb, you need roughly 4 to 5 acres of land per megawatt (MW) of capacity, meaning a 5MW solar park requires 20 to 25 acres (around 8 to 10 hectares). We incorporate natural contours, hedgerow screening, and wildflower planting into the planning process to minimise visual impact and boost biodiversity.
Commercial Battery Storage, EV Charging & Finance
Can commercial battery storage provide backup power during a grid outage?
Yes, provided the system is designed with island-mode backup hardware. While standard grid-tied systems shut down during a power cut to protect network engineers, commercial BESS systems configured with automatic changeover protection isolate safely from the grid and maintain power to critical site loads.
How big are commercial battery storage systems?
Commercial battery units are modular and scalable to match your load profile. Smaller commercial installations use compact floor-standing cabinets inside a plant room or weatherproof external enclosures, while multi-megawatt industrial systems are housed in dedicated walk-in or shipping-containerised enclosures.
Is there grant funding for installing EV charge points at work?
Yes. Run by the Office for Zero Emission Vehicles (OZEV) and confirmed until 31 March 2027, the Workplace Charging Scheme (WCS) covers up to 75% of purchase and installation costs, capped at £500 per socket for up to 40 sockets across your business, charity, or public sector sites. State-funded schools and education institutions qualify for up to £2,000 per socket.
Are there finance options or grants available for commercial solar and battery storage?
Yes. SolarSense partners with leading UK green asset finance providers to offer asset finance, hire purchase, operating leases, and zero-capex Power Purchase Agreements (PPAs), enabling cash-positive monthly savings from year one. Regional decarbonisation grants also open periodically, and businesses can often utilise capital allowances such as the Annual Investment Allowance (speak with your accountant for tax advice).
How does a Solar Power Purchase Agreement (PPA) work, and what happens if a fault occurs or we move premises?
Under a Solar PPA, a funder pays for, owns, and maintains the solar array on your roof while you purchase the electricity generated on-site at a discounted rate, typically 15% to 30% below standard grid tariffs (adjusted annually by an agreed index such as RPI or CPI). Remote monitoring tracks performance 24/7, and SolarSense resolves any faults at zero cost to you under the included O&M contract. If you sell or vacate the building, the roof lease and PPA can transfer to the new owner.
Do SolarSense offer Operations & Maintenance (O&M) for commercial systems, including third-party installs?
Yes. We provide preventative maintenance, panel cleaning, thermal imaging, fault diagnostics, and remote monitoring for commercial solar PV, battery storage, and EV charging systems across the UK. We support both SolarSense installations and systems where the original installer is no longer trading.